Srps En 13670 Today

You need: slump cone, cube molds, curing tank, cover meter, and temperature sensors.

The contractor (executor) has primary responsibility. However, the designer must provide sufficient information, and the client must allow reasonable time and budget for inspection.

Revise your company’s quality manual to reference SRPS EN 13670. Include its requirements in subcontractor agreements. srps en 13670

Yes, for any construction that requires a building permit and is subject to technical inspection. Small non-permanent structures may be exempt, but best practice is to follow it.

SRPS EN 13670 is the Serbian adopted version of the European Standard EN 13670:2009, titled "Execution of concrete structures." The "SRPS" prefix indicates that this standard has been officially accepted as the national standard by the Institute for Standardization of Serbia (ISS). You need: slump cone, cube molds, curing tank,

It replaces older, fragmented national regulations and aligns Serbia with the Eurocode system (EN 1990 to EN 1999). While Eurocodes primarily deal with design, SRPS EN 13670 deals with the execution—how to transform a design on paper into a physical, safe, and durable concrete structure on site.

Many professionals confuse this standard with Eurocode 2 (SRPS EN 1992), which covers the design of concrete structures. Think of it this way: The choice of class is usually specified by

One of the most important concepts introduced in SRPS EN 13670 is the Classification of Execution Classes. The standard recognizes that not all structures require the same level of rigor.

The execution requirements are divided into three classes based on the consequence of failure and the complexity of the structure:

The choice of class is usually specified by the designer in the project specification.