The standard applies to generation systems with a connection point in the low-voltage network. It differentiates primarily based on the system's power rating:

  • Commissioning report signed by licensed electrician.
  • For systems > 30 kVA total generation in one building → additional coordination.
  • VDE-AR-N 4105 is the backbone of the German "Energiewende" (energy transition) regarding decentralized generation. It shifts the role of generation plants from passive "feed-in" devices to active grid-supporting components. vde-ar-n 4105 english pdf

    Key Takeaway for Planners: When planning a PV or CHP system in Germany, strict adherence to VDE-AR-N 4105 is required for grid connection approval. Planners must calculate the expected voltage rise and configure the inverter's reactive power settings according to the grid operator's specific requirements (often detailed in their "TAB Niederspannung"). The standard applies to generation systems with a


    Subject: Application Rule for the Parallel Operation of Generation Systems on the Low-Voltage Network Date: October 26, 2023 Prepared for: System Planners and Electrical Engineers Commissioning report signed by licensed electrician

    Beuth is the official German sales partner for VDE, DIN, and other standards.